Heat-noise shields job finished (1981 308 GTSi)
From: Michel Savard (mysavardvideotron.ca)
Date: Tue, 5 Jan 2021 08:02:19 -0800 (PST)
I just finished the job for the floor and the firewall (still waiting for the material (fibre) ordered on Amazon to close everything. Next is the trunk as soon as I receive everything. The yellow lines show where there was an opening (10” x 1”) originally. I decided to cover it.
Michael Savard (1981 308 GTS)

Results generated by Tiger Technologies Web hosting using MHonArc.